EAPC Sues Nature and Parks Authority Over Blocked Pipeline Fiber Pilot
State-owned EAPC petitioned the Jerusalem District Court against the INPA over stalled permits for a safety fiber-optic pilot along pipeline 42 between Ashkelon and Or HaNer.

The Europe-Asia Pipeline Company (EAPC) has filed an administrative petition with the Jerusalem District Court against the Israel Nature and Parks Authority (INPA). The legal action targets the authority's refusal to adjudicate EAPC's permit application for a pilot project involving the installation of operational fiber-optic cables along a 10-kilometer stretch of petroleum pipeline 42, running between Ashkelon and Or HaNer.
EAPC operates and maintains the national oil transportation network connecting Ashkelon and Eilat. According to the petition, filed through attorney Meir Heller, the operational fibers do not constitute a commercial telecommunications venture. Instead, the installation functions as a critical safety and monitoring network designed to detect excavations, security breaches, sabotage, earthquakes, and leaks in real-time, while connecting fuel infrastructure directly to the company's main control room.
Core Disputes and Legal Claims
The state-owned pipeline company asserts that the cables are intended exclusively to safeguard a vital national fuel conduit that traverses designated nature reserves. EAPC maintains that it opened a coordination file with the INPA, conducted a field survey, and addressed all technical and engineering inquiries by July 2026, which included submitting a comprehensive ecological report.
However, the petition states that the INPA notified EAPC on July 27, 2026, that it would withhold approval pending guidance from the Ministry of Justice, disputing EAPC's statutory right to lay operational fibers along the existing right-of-way. EAPC argues that the environmental authority improperly conflated the operational safety pilot with a separate commercial fiber initiative and imposed unauthorized prerequisites.
Institutional Responses
The petitioner requests that the court issue an order nisi compelling the INPA to render a reasoned decision within 14 days and to declare that the authority's discretion under the National Parks Law is strictly confined to protecting natural values.
In response, the Israel Nature and Parks Authority stated that the legal filing had not yet been formally received.
"The authority's position will be submitted through standard judicial proceedings once reviewed. EAPC has a documented history of severe environmental incidents, most notably the Evrona oil spill, which resulted in unprecedented financial penalties. The INPA remains committed to fulfilling its statutory mandate to protect Israel's natural heritage and prevent future ecological disasters."
EAPC countered the criticism by emphasizing the environmental utility of the undertaking, describing it as an advanced safety initiative designed to protect local ecosystems through cutting-edge monitoring technology rather than a commercial enterprise.