Israel Railways Announces Major Weekend Service Disruptions and Station Closures

Israel Railways announced temporary service disruptions and station closures across central and national routes for the weekend of November 26-28, 2026, due to essential infrastructure and signaling upgrade works.

Israel Railways Announces Major Weekend Service Disruptions and Station Closures
Photo: רכבת ישראל

Israel Railways has announced sweeping temporary disruptions and schedule modifications across its national network scheduled for the weekend of November 26 to 28, 2026. The adjustments are necessary to facilitate vital infrastructure engineering projects and the ongoing rollout of advanced signaling systems designed to boost operational safety and capacity.

The service alterations will be implemented in two distinct phases, beginning in the central region before expanding nationwide, with regular timetables fully restored by early Sunday morning, November 29, 2026, at approximately 1:00 AM.

Phase One: Central Region Modifications

The first phase of the engineering works will take place on Thursday and Friday, November 26 and 27, in the Kfar Chabad area for track maintenance and safety upgrades. During these two days, the Kfar Chabad and Lod Ganei Aviv stations will be temporarily closed to passengers, and core rail corridors will operate on split schedules.

Key route adjustments for Thursday and Friday include:

  • Beersheba–Nahariya/Karmiel trains will run between Beersheba Center and Lod, and between Tel Aviv HaHagana/Savidor Center and northern stations.
  • Ashkelon–Binyamina services will be split between Ashkelon and Lod, and between Tel Aviv HaHagana and Binyamina.
  • Beit Shemesh–Herzliya trains will operate between Beit Shemesh and Lod on Thursday, and on a split schedule between Beit Shemesh-Lod and Tel Aviv HaHagana-Herzliya on Friday.

To accommodate commuters, Israel Railways will operate a dedicated shuttle train service between Lod and Tel Aviv Savidor Center—stopping at Tel Aviv HaHagana and Tel Aviv HaShalom—at a frequency of two trains per hour in each direction. In addition, complimentary shuttle buses will be deployed alongside reinforced regular public bus lines. The Western Negev line, passing through Bat Yam, Holon, Rishon LeZion Moshe Dayan, Sderot, and Netivot, will operate according to standard schedules, with travelers to and from Beersheba advised to utilize this route.

Phase Two: Nationwide Signaling Upgrades

The second phase is scheduled for Saturday night, November 28, to prepare for the integration of the European Train Control System (ETCS), which aims to increase train frequencies in Jerusalem and nationwide while enhancing safety standards. During Saturday evening, nationwide rail traffic will be significantly curtailed, with southbound trains terminating at Lod and northbound services ending at Netanya.

Furthermore, the Jerusalem Yitzhak Navon–Hadera line, including stops at Ben Gurion Airport, will not operate. Nahariya–Modi'in trains will run exclusively between Nahariya and Netanya, and services on the Beersheba–Herzliya line via the Western Negev route will terminate at Rishon LeZion Moshe Dayan.

Israel Railways recommends that passengers plan their journeys in advance, utilize alternative public transit options, and consult official company channels or customer service for real-time updates.

Related News