Israel Railways Boosts Jerusalem Line Frequency to Three Trains Per Hour
Israel Railways will operate three trains per hour to Jerusalem starting November 29, a first since the 2018 launch, alongside expanded routes to Modi'in, Netanya, and Hadera.

Israel Railways has announced a significant expansion in train service frequency between Jerusalem and central regions, alongside reinforced schedules for Modi'in and early-morning connections on the Hadera-Jerusalem line. The schedule updates take effect on Sunday, November 29, following commuter complaints regarding service intervals during the previous week.
Expanded Peak-Hour Service
During peak hours from 6:00 to 9:00 AM and 3:00 to 7:00 PM, three trains per hour will operate on the route connecting Jerusalem Yitzhak Navon Station with Ben Gurion Airport, Tel Aviv, Herzliya, and Netanya, replacing the current two-train schedule. According to Israel Railways, this marks the first time since the inauguration of the high-speed line in 2018 that such a frequency has been deployed between Jerusalem and the center of the country. At Netanya Station, the total peak-hour frequency will rise to five trains per hour.
Additional schedule adjustments target commuters traveling between Jerusalem and Modi'in Center, where two morning trains will be added between 7:00 and 9:00 AM. Railway officials noted that passengers in both cities had anticipated this reinforcement for an extended period. Furthermore, the Jerusalem-Hadera line will receive two extra early-morning trains between 5:00 and 6:00 AM, with one running in each direction. At Hadera West Station, departure times will be adjusted to improve synchronization with early bus services, following feedback gathered since the implementation of the new timetable.
Technical Upgrades and Upcoming Works
The schedule enhancements follow the recent extension of the Jerusalem line to Beit Yehoshua, Netanya, and Hadera West stations. Following complaints from passengers over wider service gaps, disrupted connections, and longer travel times, railway management explained that the initial timetable adjustments were designed to prepare the network for a third hourly train from Jerusalem. The increased frequency is facilitated by the ETCS Level 2 signaling system, which is engineered to support higher train densities on existing tracks. The Jerusalem route is the pioneer line utilizing this technology, which will later expand to increase capacity along the Ayalon corridor.
Prior to the launch of the new timetable, service disruptions will occur on Saturday night, November 28, when trains on the Jerusalem Yitzhak Navon-Hadera line will be suspended to accommodate technical preparations for the signaling system. Normal operations are scheduled to resume at approximately 1:00 AM on Sunday.
Israel Railways reported that more than 45 million passengers have passed through Jerusalem Yitzhak Navon Station since its opening. In the coming weeks, an additional station entrance is slated to open near the Supreme Court and the Shazar parking lot. Simultaneously, the company is advancing plans to extend the high-speed rail line into downtown Jerusalem and the historic Khan area through an underground tunnel featuring two new stations: Jerusalem Center and Jerusalem Khan.



